It's been a while since the last post here, but the time has come to put across my view on the tricky question of BIM ownership. I'm not an active "BIM practitioner", but am a self-declared advocate and enthusiast, so these thoughts should be read with that in mind.
This is a much-debated and frequently raised subject, and not one that I'm particularly fond of, but it's clearly something that needs to be discussed.
Who owns
the model?
During a
recent talk I gave at Glasgow University, a point that I made was that the
construction industry would really be required to re-visit and re-think its
approach to contractual relationships in order for BIM to be allowed
to flourish. This is no easy or small
ask, as it would involve a completely fresh approach to the way that
information and data is shared and handled between stakeholders and key parties.
At present,
I believe there is no suitable contractual framework in the UK to address this
issue. This is essential, as BIM by
nature is based on a notion of openness and sharing of information.
Such a contractual
framework would need to outline and define the level of modeling required for a
particular project, the responsibilities of each party or stakeholder involved
in input or manipulation of data, as well as the deliverable expected from the
model to each party.
In USA,
addenda have been introduced – AIA-E202 & ConsensusDocs301. The objective of these was to balance the
risk and benefits associated with the sharing of models and intellectual
data.
Part of AIA states:
“1.3.2.1
Drawings, Specifications and other documents, including those in electronic
form, prepared by the Architect and the Architect's consultants are Instruments
of Service for use solely with respect to this project. The Architect and
Architect's consultants shall be deemed the authors and owners of their
respective Instruments of Service and shall retain all common law, statutory
and other reserved right, including copyrights.”
This seems to fit the general state in the UK, where the
architect / designer would be the “owner”.
However, my thoughts are that the building itself ultimately would be
the “owner” of the model, and each party would act as a “custodian” during the
period that they were engaged in inputting data (see previous blog post). The data relates specifically to the project,
and so should be “owned” by the same.
Practically speaking, the client / project owner would be the keeper of the
BIM, and would act as the legacy manager for it. In order for BIM to succeed and for the full
benefits to be realised, the true owner must be the building / project owner –
i.e. the client.
Through out the life of a building for example, the
largest cost / profit / benefit / use is post-construction, during the
occupation of the building. The aim of
BIM is to define and create a usable pool of data that can be leveraged to
extract value during the design, delivery, but crucially the operation of the
building. The building owner will be the
last party (prior to decommissioning) who will handle and use the data, so they
should be the ultimate owner of the BIM.
What about liability?
My own belief is that liability would remain largely
unchanged throughout the design and delivery process, when transitioning to
BIM. My own thought, as outlined above,
is that each party – designer, consultant, engineer, contractor, etc – simply act
as “custodians” of the data for a period in the project lifecycle. Their input and the expectations of their
delivery would remain largely the same within or outwith a BIM-centred project.
Key to this would be the main point outlined above –
the contractual framework. As stated,
this would need to define and address the deliverable expected from each
party. Simply, does that party meet the
expectation defined for their role within the framework?
Additionally, the form of deliverable from the BIM to
each party could be detailed and scheduled.
This could be something as simple as a spreadsheet schedule or plan 2D
PDF be extracted from the data for a particular party to use for a particular
activity. This could remove some of the
complexity or uncertainty that an individual may feel is a barrier if required
to navigate around the data-rich model itself.
Just because all the data is available, doesn’t mean that it all needs
to be used by everyone.
At present, I do not believe there is a specific policy
that has been developed in the UK for limiting liability of parties engaged in
BIM. Would current insurance be
appropriate? I’m no lawyer, but I would
expect that a deliverable could be assessed on the basis of “does the outcome
meet the expectation?”.
With the fundamental basis of collaboration and the
sharing of data in place, it’s not unreasonable to expect that a greater level
of transparency and auditability could be demonstrated during the development
and execution of a project. Regular data
audits could be performed, and used as the basis to assess the performance of
the “BIM”. Appropriate levels of data,
of the right quality could be determined, along with the point in the project
timeline when the data was added, and therefore the party responsible.
Moving to a more efficient, higher-quality method of
project delivery is in everyone’s interest.
The ability to produce better projects that have higher-performance
levels as well as a lower environmental and financial impact is a goal that we
would all like to see achieved.
As an industry, is it possible or practicable to make a
move to come together to try and achieve this ideal and start collaborating
more without delaying to consider how we can apportion blame if we can’t play
nicely together?
BIM first, ask questions later?*
*no kittens were harmed during the writing of this post
Great Blog... The information you shared is very effective for learners I have got some important suggestions from it, Keep Sharing such a nice blog.
ReplyDeletecad services in UK
cad drafting services in USA
autocad solutions in UK
BIM Project Management in India
Get to know many things about building information modeling (BIM). Bim model Denver, Colorado is also giving best service. This is so intriguing to lean progressively about structure data displaying. I have a hankering to adapt all the more new things and use it in my life. Thank you so much.
ReplyDeleteCool you write, the information is very good and interesting, I'll give you a link to my site. bim consulting firm
ReplyDeleteWe provide the best industrial automation training in India by providing students with hands-on practical training provided by the Expert trainers in chennai.
ReplyDeletetekla training in chennai
bim course In chennai
uc satın al
ReplyDeleteminecraft premium
yurtdışı kargo
lisans satın al
özel ambulans
en son çıkan perde modelleri
nft nasıl alınır
en son çıkan perde modelleri
Good content. You write beautiful things.
ReplyDeletekorsan taksi
vbet
sportsbet
taksi
hacklink
sportsbet
hacklink
mrbahis
mrbahis
Good text Write good content success. Thank you
ReplyDeletebonus veren siteler
poker siteleri
betmatik
kralbet
betpark
slot siteleri
kibris bahis siteleri
mobil ödeme bahis
van
ReplyDeleteyalova
diyarbakır
düzce
gümüşhane
EW1Pİ
sultangazi
ReplyDeleteordu
mardin
bodrum
sincan
SOS
maraş
ReplyDeletebursa
tokat
uşak
samsun
CZKG5M
salt likit
ReplyDeletesalt likit
dr mood likit
big boss likit
dl likit
dark likit
YEFP